What to do from the day you book your space to the day after the show.
A good booth needs time for three things: the design, your approval and the build. Here is the order things happen in, so nothing is left to the last week.
Do you want to meet buyers, show products, or collect sign-ups? The answer decides whether you need a meeting area, shelves, screens or a counter. Decide your budget at the same time.
Send your booth builder the size, the open sides, your logo and brand guide, the products you'll show and the things you need. Our Plan your booth form asks for all of it.
You get a 3D design, a floor plan and a price. Ask for changes now: a change on paper takes minutes, a change in the factory takes days.
Send the final artwork for printing. The booth is built and test-fitted in the factory, so the build on site goes quickly.
Order power, internet and cleaning from the organizer before their deadlines, and register your team for badges.
The booth is installed during the setup days. Walk through it before opening: lights, screens, power sockets and storage.
The booth is taken down. Reusable parts can be kept for your next exhibition. Then follow up with every contact you collected while the conversation is still fresh.
Send us the exhibition and your space size, and we'll plan the booth around the organizer's setup days.